Cold-mixed asphalt adhesive is a two-component synthetic resin-based adhesive that can be combined with various aggregates to form a floor surface. It is made by blending and modifying various petrochemical products and high-molecular material modifiers. After curing, it has excellent adhesion and good toughness, which can resist minor cracks in the substrate. The floor has excellent resistance to impact, water, and various chemicals, and has stable performance and good road performance. It can meet various demands of the colored pavement market.


Product Detail

Product Tags

Product Description

Cold-mixed colored permeable asphalt concrete
The cold-mixed colored permeable asphalt concrete system is an efficient construction scheme where modified asphalt mixture can be quickly laid and formed. This system adopts a coarse aggregate void structure, with the pavement void ratio reaching over 12%. The forming thickness is generally 3 to 10 cm. It is usually used as the colored permeable asphalt surface layer for new roads, and can also be used to overlay a colored permeable asphalt surface layer on existing roads. As a new type of green pavement material, this system has advantages such as economy, environmental protection, aesthetics, and convenience.

2
https://www.jinhuicoating.com/modified-epoxy-resin-based-cold-mixed-asphalt-adhesive-cold-mixed-tar-glue-product/

PRODUCT ADVANTAGES

  1. High-quality materials: The production and use of cold-mixed high-viscosity colored permeable asphalt do not generate any waste, which is beneficial to environmental protection and has excellent anti-slip properties, good noise reduction effect, strong adhesion and comprehensive performance.
  2. The durability of the road surface: The road surface is resistant to aging, weathering, wear, compression, chemical corrosion, and has excellent heat resistance and frost resistance.
  3. Rich in colors: It can be freely combined with different colored cold-poured high-viscosity colored permeable asphalt to create a variety of decorative colors and patterns, presenting an elegant decorative texture.
  4. Construction convenience: The traditional hot-mix construction method for colored permeable asphalt has been improved. There is no need to locate a hot-mix asphalt plant anymore. Construction can be carried out on any size site, and it can be done in winter without affecting the strength.

APPLICATION SCENARIOS

Colored cold-mixed asphalt pavement is suitable for municipal walkways, garden paths, urban squares, high-end residential communities, parking lots, commercial squares, business office buildings, outdoor sports venues, bicycle paths, children's playgrounds (badminton courts, basketball courts), etc. The application scope is very extensive. All areas that can be paved with permeable concrete can be replaced with cold-mixed asphalt. There are various color options available, and the strength can be guaranteed to meet the testing requirements.

PRODUCT DETAILS

construction procedure

  1. Formwork setting: The formwork should be made of solid, low-deformation and high-stiffness materials. The formwork setting work for separated formwork and area formwork should be carried out in accordance with the design requirements.
  2. Stirring: It must be carried out strictly in accordance with the mix ratio, and no wrong or mistaken materials should be added. The first batch of materials must be weighed, and then marks can be made in the feeding mechanical container for subsequent reference and feeding according to the standard.
  3. Finished product transportation: After the mixed finished material is discharged from the machine, it should be promptly transported to the construction site. It is preferable to arrive at the construction site within 10 minutes. It should not exceed 30 minutes in total. If the temperature is higher than 30°C, the covering area must be increased to prevent surface drying and to avoid affecting the construction quality.
  4. Paving construction: After the paving layer is laid out and leveled, low-frequency hydraulic workstations are used for rolling and compaction. After the rolling and compaction, the surface is promptly smoothed using concrete polishing machinery. Areas that cannot be polished by the surrounding polishing machines are manually brushed and rolled to ensure a smooth surface with uniform distribution of stones.
  5. Maintenance: Do not allow people to walk or animals to pass before initial setting. Any local damage will directly result in incomplete maintenance and cause the pavement to fall off. The complete setting time for cold-mixed colored permeable asphalt is 72 hours. Before complete setting, no vehicles are allowed to pass.
  6. Removing formwork: After the curing period expires and it is confirmed that the strength of the cold-mixed colored permeable asphalt meets the standards, the formwork can be removed. During the removal process, the corners of the concrete pavement must not be damaged. It is necessary to ensure the integrity of the cold-mixed colored permeable asphalt blocks.