Product aliases
- Alkyd iron red paint, alkyd iron red anticorrosion primer, alkyd primer, alkyd grey primer, alkyd anticorrosion primer.
Basic parameters
| English name of product | Alkyd antirust paint |
| Chinese name of product | Alkyd antirust paint |
| Dangerous Goods No. | 33646 |
| UN No. | 1263 |
| Organic solvent volatility | 64 standard metre³. |
| Brand | Jinhui Paint |
| Model No. | C52-1-1 |
| Colour | Iron red, grey |
| Mixing ratio | Single component |
| Appearance | Smooth surface |
Product Ingredients
- Alkyd antirust paint consists of alkyd resin, iron oxide red, antirust pigmented filler, additives, No.200 solvent gasoline and mixed solvent, and drying agent.
Characteristics
- Paint film anti-chalking, good protection performance, good light and colour retention, bright colour, good durability.
- Strong adhesion, good mechanical properties.
- Strong filling ability.
- High pigment content, good sanding performance.
- Poor in solvent resistance (petrol, alcohol, etc.), acid and alkali resistance, chemical resistance, slow drying speed.
- Good matching performance, good combination with alkyd top coat.
- Tough paint film, good sealing, excellent anti-rust performance, can withstand the impact of temperature difference.
- Good construction performance.
Usage
- Suitable for steel surface, machinery surface, pipeline surface, equipment surface, wood surface, etc. It can not be used as the matching antirust paint of two-component paint and strong solvent paint.
Painting construction
- After opening the barrel, it must be stirred evenly, left to stand, and after maturing for 30min, add appropriate amount of thinner and adjust to the construction viscosity.
- Diluent: special diluent for alkyd series.
- Airless spraying: Dilution amount is 0-5% (by weight ratio of paint), nozzle calibre is 0.4mm-0.5mm, spraying pressure is 20MPa-25MPa (200kg/cm²-250kg/cm²).
- Air spraying: Dilution amount is 10-15% (by weight ratio of paint), nozzle calibre is 1.5mm-2.0mm, spraying pressure is 0.3MPa-0.4MPa (3kg/cm²-4kg/cm²).
- Roller coating: Dilution amount is 5-10% (by paint weight ratio)
Surface treatment
- Steel surface sandblasting treatment to Sa2.5 grade, surface roughness 30um-75um.
- De-rusting of electrician's tools to St3 grade.
Front course matching
- Paint directly on the surface of steel whose rust removal quality reaches Sa2.5 grade.
Back course matching
- Alkyd iron-cloud paint, alkyd paint.
Technical parameters: GB/T 25251-2010
- Status in the container: no hard lumps after stirring and mixing, in a uniform state
- Fineness: ≤50um (standard index: GB/T6753.1-2007)
- Drying time: surface drying ≤5h, solid drying ≤24h (standard index: GB/T1728-79)
- Salt water resistance: 3% NaCl, 24h without cracking, blistering, peeling (standard index: GB/T9274-88)
Construction parameters
| Recommended film thickness | 60-80um |
| Theoretical dosage | about 120g/m² (35um dry film, excluding loss) |
| Suggested number of coats | 2 ~ 3 |
| Storage temperature | -10 ~ 40 ℃ |
| construction temperature | 5 ~ 40 ℃ |
| Trial period | 6h |
| Construction method | brushing, air spraying, rolling can be. |
| Painting interval
|
Substrate temperature ℃ 5-10 15-20 25-30 |
| Shorter interval h 48 24 12 | |
| Longer interval not more than 7 days. | |
| The substrate temperature must be higher than the dew point of more than 3 ℃, when the substrate temperature is lower than 5 ℃, the paint film is not cured, should not be constructed. | |
Caution
- In the high temperature season construction, easy to dry spray, to avoid dry spray can be adjusted with thinner until not dry spray.
- This product should be used by professional painting operators according to the instructions on the product package or this manual.
- All coating and use of this product must be carried out in accordance with all relevant health, safety and environmental regulations and standards.
- If in doubt as to whether this product should be used, please contact our technical service department for details.
Packaging
- 25kg drum
Transport and storage
- The product should be stored in a cool and ventilated place, prevented from direct sunlight, and isolated from sources of ignition, away from heat sources in the warehouse.
- When transporting the product, it should be prevented from rain, sunlight exposure, avoid collision, and should comply with the relevant regulations of the traffic department.
Safety Protection
- The construction site should have good ventilation facilities, and painters should wear glasses, gloves, masks, etc. to avoid skin contact and inhalation of paint mist.
- Smoking and fire are strictly prohibited at the construction site.